__38146.original.png)
Hornby OO Coaches
-
Hornby OO Gauge GNER Mk3 Trailer Standard (TS) ‘42340’ – Era 9 R40435C
Hornby
د.إ209.30To allow locomotives to run at 125mph on Britain's Victorian railways, British Railways needed new rolling stock. Significant improvements of the Mk2 included new secondary air suspension between the bogies and the coach body as well as aerodynamic...د.إ209.30 -
Hornby OO Gauge GNER Mk3 Trailer Standard (TS) ‘42063’ – Era 9 R40435B
Hornby
د.إ209.30To allow locomotives to run at 125mph on Britain's Victorian railways, British Railways needed new rolling stock. Significant improvements of the Mk2 included new secondary air suspension between the bogies and the coach body as well as aerodynamic...د.إ209.30 -
Hornby OO Gauge GNER Mk3 Trailer Standard (TS) ‘42065’ – Era 9 R40435
Hornby
د.إ209.30To allow locomotives to run at 125mph on Britain's Victorian railways, British Railways needed new rolling stock. Significant improvements of the Mk2 included new secondary air suspension between the bogies and the coach body as well as aerodynamic...د.إ209.30 -
Hornby OO Gauge GNER Mk3 Trailer Guard Standard (TGS) ‘44045’ – Era 9 R40433
Hornby
د.إ209.30To allow running at 125mph on Britain's Victorian railways, British Railways needed new rolling stock. Significant improvements of the Mk2 included new secondary air suspension between the bogies and the coach body as well as aerodynamic skirting on...د.إ209.30 -
Hornby OO Gauge GNER Mk3 Trailer First Disabled (TFD) ‘41043’ – Era 9 R40432
Hornby
د.إ209.30To allow running at 125mph on Britain's Victorian railways, British Railways needed new rolling stock. Significant improvements of the Mk2 included new secondary air suspension between the bogies and the coach body as well as aerodynamic skirting on the...د.إ209.30 -
Hornby OO Gauge GNER Mk3 Trailer First (TF) ‘41044’ – Era 9 R40431
Hornby
د.إ209.30To allow running at 125mph on Britain's Victorian railways, British Railways needed new rolling stock. Significant improvements of the Mk2 included new secondary air suspension between the bogies and the coach body as well as aerodynamic skirting on the...د.إ209.30 -
Out of Stock
Hornby OO Gauge BR, Mk3 Trailer Standard Open, 42283 - Era 7 R40391
Hornby
MSRP: د.إ219.24د.إ209.30MSRP: د.إ219.24د.إ209.30 -
On SaleNow: د.إ370.11Was: د.إ413.97
-
On SaleNow: د.إ194.88Was: د.إ211.93
-
On SaleNow: د.إ182.74Was: د.إ211.93
-
On Sale
Hornby OO Gauge Transport for Wales, Mk4 DVT 82229 Era 11 R40190
Hornby
Now: د.إ389.80Was: د.إ413.97Now: د.إ389.80Was: د.إ413.97 -
On SaleNow: د.إ389.80Was: د.إ413.97
-
On SaleNow: د.إ389.80Was: د.إ413.97
-
On Sale
Hornby OO Gauge Coach Packs BR, Class 370 Advanced Passenger Train 2-car TRBS Coach Pack, 48403 + 48404 - Era 7 R40012
Hornby
Now: د.إ438.34Was: د.إ530.92This coach pack includes the two TRBS coaches required in part to complete R3873 5-car Pack (Sets 370 003 and 370 004). Colour and contents of products may vary from those illustrated yTechnical Specification & Detail ...Now: د.إ438.34Was: د.إ530.92 -
On Sale
Hornby OO Gauge Coaches BR, InterCity APT-U Ex-TS Development Vehicle, Sc48204/977527 - Era 7 R4970
Hornby
Now: د.إ187.61Was: د.إ267.78In mid-1984, TS Sc48204 was withdrawn from Set 370 004 and was sent to the Engineering Development Unit (EDU) at Derby RTC for conversion to an APT-U test vehicle, with extensive rebuilding of the underframe being undertaken in order to incorporate...Now: د.إ187.61Was: د.إ267.78 -
Hornby 00 Gauge SR, Bulleid 59' Corridor Brake Third, 2845 - Era 3 R4884
Hornby
د.إ285.03Technical Specification & Detail Length 243mm Period Era 3 (1923 - 1947) ...د.إ285.03